Situations may arise that have not been addressed by either manual and shall be addressed on a case-by-case basis, with the approval of the Town Engineer and/or the Director. Deviations from the requirements and specifications may be allowed, if approved by the Town Engineer and/or the Director, at the applicant's expense.
Call Before You Dig
Prior to the issuance of a permit, the permittee must provide a "Call Before You Dig" number on each individual permit application.
Inspection
Call the Engineering Department 24 hours prior to construction to arrange for an inspection.